Our Summer Projects

Resized_20210305_121639.jpg

01

Raise Sidewalk

This project is to raise sidewalk at the driveway crossing. This will solve the large puddle situation. 

Need to raise $1200

02

Asphalt Surfacing

This project has a few items:

1. Asphalt surfacing by the 4/5 door. $3670

2. Asphalt surfacing by the 6-8 doors. $3700

3. Asphalt in front of the deck. $3800